McClean DD Status
Review McClean diligence readiness, missing requirements, and evidence routing from the Data Room hub.
Continue McClean DD Review →Today’s command
Open the operator queue for your next priority.
Operator queue syncing · 6 active deals
Wednesday, May 13, 2026 · 6 deals active · $13.5M tracked in active deals
Review McClean diligence readiness, missing requirements, and evidence routing from the Data Room hub.
Continue McClean DD Review →Code compliance and notices; proration and deposit information; litigation and claims; closing statement materials.
Open PSA Obligations →Download the seller-ready PDF generated from the expanded 33-obligation Exhibit B matrix.
Open package →Inspect supporting, inferred, duplicate, and unresolved DD evidence without mutating readiness.
Open Evidence Matrix →Portfolio diligence health is temporarily unavailable. Read-only oversight remains accessible.
Open portfolio oversight →22 hard closing blocker(s) remain.
Open closing checklist →8 title/survey item(s) still unresolved.
Review title items →5 environmental item(s); 29 lender-required approval(s) remaining.
Open overlay →Work current attention, review, ownership, and follow-up lanes.
Open queue →Inspect lifecycle signals from the existing Operator Command advisory panel.
Open advisory panel →Review module health, security coverage, and audit status from safe OS surfaces.
Open system audit →Pulled from Operator Command queue.
Nothing queued on the capped home view.
0% complete (readiness)
Blocked — 10 closing conditions outstanding
0% readiness · Not started inspection · Unscheduled · entitlement-driven
Open contract deal →0% complete (readiness)
Blocked — Negotiate and execute PSA
0% readiness · Pre-execution inspection · Pre-execution
Open contract deal →COMPLETE
Healthy
100% · production proven · Large intake jobs remain operationally sensitive to Blob/job throughput.
COMPLETE
Healthy
100% · production proven · Exports must continue to state read-only derivation and no readiness mutation.
COMPLETE
Healthy
100% · production proven · Evidence inference remains read-only and must not auto-satisfy legal obligations.
COMPLETE
Healthy
100% · production proven · Home must continue to degrade safely when secondary APIs are slow.
COMPLETE
Healthy
100% · production proven · Overlay must remain read-only and not mutate Data Room readiness.
COMPLETE
Healthy
100% · production proven · Currently focused on McClean while architecture supports additional deals later.
COMPLETE
Healthy
100% · production proven · Fixture gap remains named where actual Exhibit B source text is unavailable.
COMPLETE
Healthy
100% · production proven · Approval controls must remain constrained by allowed approval roles.
COMPLETE
Healthy
99% · production proven · Review-event routes must remain explicit and role-validated.
COMPLETE
Healthy
98% · production proven · Full portfolio load can be slow; scoped deal loader exists as a mitigation.
COMPLETE
Healthy
98% · production proven · Classification is deterministic alias-based, not document-content analysis.
COMPLETE
Healthy
95% · production proven · Audit exports can freeze stale review state if generated after a delayed ledger read.
MOSTLY_COMPLETE
Needs review
85% · production proven · Static UI actor remains a simplification for server action attribution.
MOSTLY_COMPLETE
Needs review
82% · smoke tested · Can amplify upstream duplicate queue signals.
MOSTLY_COMPLETE
Needs review
79% · production deployed · Home can imply readiness even when deeper module pages time out.
MOSTLY_COMPLETE
Needs review
75% · smoke tested · Packet readiness spans Data Room, contracts, and intake shell models.
MOSTLY_COMPLETE
Needs review
72% · smoke tested · Auto-advance routes require strict guardrails before broad production use; adapter recommendations are advisory only.
PARTIAL
Partial
83% · production deployed · Production queue page timeout
PARTIAL
Partial
68% · production proven · Advisory lifecycle queue items are production-visible through queue-health and locally visible in read-only UI only; production UI acceptance is still pending and items must remain explicitly non-executable.
PARTIAL
Partial
68% · smoke tested · Several execution adapters still default to preview/noop; lifecycle boundary queue items have read-only UI exposure but must remain advisory before any mutation path.
PARTIAL
Partial
67% · smoke tested · Many submodules can drift without a construction aggregate contract.
PARTIAL
Partial
65% · production deployed · Predict signals are consumed by multiple downstream scoring/readiness modules.
PARTIAL
Partial
64% · smoke tested · Feasibility and Decision Engine can both describe readiness and risk.
PARTIAL
Partial
63% · smoke tested · Exports can freeze stale or divergent read-model terminology.
PARTIAL
Partial
61% · smoke tested · Zoning can become a duplicate source for feasibility/stage blockers.
PARTIAL
Partial
60% · smoke tested · Evidence Intake and Data Vault both ingest document-like objects.
PARTIAL
Partial
57% · smoke tested · Standalone-heavy integration
PARTIAL
Partial
55% · smoke tested · Decision outputs can be re-derived in multiple services.
PARTIAL
Partial
43% · smoke tested · Automation apply route can become a parallel workflow mutation surface.
STANDALONE_ONLY
Partial
44% · local only · Boundary audit currently reports fixture blockers and is not yet sourced from live project records.
STANDALONE_ONLY
Partial
44% · local only · Adapter recommends canAdvanceStage for execution-ready rows, but must remain non-authoritative until human approval and Stage Engine policy are wired.
STANDALONE_ONLY
Partial
35% · local only · CRM remains standalone and cannot drive ownership, queue routing, or deal views until adapter contracts are accepted.
No recent deal movement.
Queue updates and workflow outcomes will appear here.