Access easements and reciprocal agreements
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by Access easements and reciprocal agreements.
Read-only tracker
51 Exhibit B obligations tracked for mclean-tx-psa. No readiness, workflow, stage, waiver, or legal sufficiency mutation is performed here.
No overdue seller requests currently surfaced.
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by Access easements and reciprocal agreements.
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by Closing statement and settlement materials.
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by DOT and roadway correspondence.
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by Encroachment and boundary materials.
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by Environmental permits.
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by Exception documents.
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by Insurance claims history.
required_for_lender | lender: yes | closing: yes | IC: yes
Lender packet blocked by Phase II ESA and subsurface environmental reports.
No stale under-review seller responses.
Latest request batch
2026-05-12T17:59:21.762Z | 33 obligations
Latest seller response
2026-05-12T19:05:00.000Z | 1 mapped
Latest review note
Production acceptance check for reviewer approval queue on safe non-critical zoning verification item.
5. Access, TXDOT, Right-of-Way, and Easements
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
10. Entity, Authority, Litigation, and Closing Deliverables
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
3. Geotechnical and Engineering
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
3. Geotechnical and Engineering
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
10. Entity, Authority, Litigation, and Closing Deliverables
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
4. Environmental, Zoning, Permits, and Governmental Approvals
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
5. Access, TXDOT, Right-of-Way, and Easements
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
3. Geotechnical and Engineering
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
2. Survey, Plats, and Site Plans
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
4. Environmental, Zoning, Permits, and Governmental Approvals
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
9. Insurance, Claims, and Loss History
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
9. Insurance, Claims, and Loss History
Requested 1 days ago | status: requested | outstanding: 1 days
Track seller response and review when received.
generated: 2026-05-12T17:59:21.762Z | by: Production Smoke Operator | obligations: 33
responses: 1 | latest response: 2026-05-12T19:05:00.000Z | sent: not marked sent
PDF: mclean-tx-psa-psa-exhibit-b-follow-up.pdf
McClean daily workflow
Read-only operating view for the current filter. It does not mutate Data Room readiness, approve obligations, execute workflow, advance stages, send email, or create default/breach conclusions.
Next seller follow-up
requested | 1 days
Track seller response and review when received.
Next legal review
requested | 1 days
Track seller response and review when received.
Next title review
requested | 1 days
Track seller response and review when received.
Next engineering review
requested | 1 days
Track seller response and review when received.
Closing readiness
0%34 blockers
Lender readiness
3%29 blockers
IC readiness
2%43 blockers
requested | none | 1 days
Lender packet blocked by Access easements and reciprocal agreements.
requested | none | 1 days
Legal review required for Authority and approvals.
requested | none | 1 days
Legal review required for Boring logs.
requested | none | 1 days
Lender packet blocked by Closing statement and settlement materials.
requested | none | 1 days
Legal review required for Code compliance and notices.
Lender blocker | lanes: title, legal
Await seller response; add a note if reviewer follow-up is needed.
Lender blocker | lanes: finance, legal
Await seller response; add a note if reviewer follow-up is needed.
Lender blocker | lanes: engineering, legal
Await seller response; add a note if reviewer follow-up is needed.
Lender blocker | lanes: title, legal
Await seller response; add a note if reviewer follow-up is needed.
Lender blocker | lanes: environmental, legal
Await seller response; add a note if reviewer follow-up is needed.
1 days outstanding | title, legal
Track seller response and review when received.
1 days outstanding | legal
Track seller response and review when received.
1 days outstanding | engineering, legal
Track seller response and review when received.
1 days outstanding | engineering, operations
Track seller response and review when received.
1 days outstanding | finance, legal
Track seller response and review when received.
No stale under-review items.
approve_sufficient | 2026-05-12T20:57:26.408Z
Production acceptance check for reviewer approval queue on safe non-critical zoning verification item.
approve_sufficient | 2026-05-12T20:22:17.258Z
Production acceptance allowed-role approval test for non-closing-critical risk management notices. No Data Room readiness mutation, workflow action, stage advancement, or email intended.
seller_response_received | 2026-05-12T19:05:00.000Z
Production smoke note-only seller response intake test. No legal approval or readiness mutation intended.
add_review_note | 2026-05-12T17:33:09.136Z
Production smoke note only: confirm append-only PSA obligation review ledger records without changing readiness.
Showing 51 obligations after filters. Use the full workbench below only when an explicit review event needs to be recorded.
Filter obligations by reviewer lane. Approval still requires matching role metadata.
Reviewer workbench
Work assigned obligations one at a time. Actions append lifecycle events only; no bulk approval.
51 queued obligations
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | sufficiency: missing | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
10. Entity, Authority, Litigation, and Closing Deliverables
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
2. Survey, Plats, and Site Plans
status: requested | sufficiency: missing | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
1. Title Commitment and Exception Documents
status: under_review | sufficiency: adjacent_only | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: adjacent_only | allowed approval roles: finance, legal, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
2. Survey, Plats, and Site Plans
status: requested | sufficiency: missing | allowed approval roles: title, legal, engineering, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | sufficiency: missing | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: adjacent_only | allowed approval roles: engineering, legal
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
2. Survey, Plats, and Site Plans
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review evidence and approve only as title/legal if sufficient.
1. Title Commitment and Exception Documents
status: under_review | sufficiency: inferred_related | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Review evidence and approve only as legal/finance/operations if sufficient.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review evidence and approve only as environmental/legal if sufficient.
1. Title Commitment and Exception Documents
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review evidence and approve only as title/legal if sufficient.
5. Access, TXDOT, Right-of-Way, and Easements
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
10. Entity, Authority, Litigation, and Closing Deliverables
status: requested | sufficiency: adjacent_only | allowed approval roles: legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: legal, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
10. Entity, Authority, Litigation, and Closing Deliverables
status: requested | sufficiency: missing | allowed approval roles: legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
10. Entity, Authority, Litigation, and Closing Deliverables
status: under_review | sufficiency: inferred_related | allowed approval roles: legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
7. Leases, Operating Contracts, and Property Agreements
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
7. Leases, Operating Contracts, and Property Agreements
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
7. Leases, Operating Contracts, and Property Agreements
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
7. Leases, Operating Contracts, and Property Agreements
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: approved | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: No overlay readiness change expected.
Explicit operator/legal approval recorded; no automatic readiness mutation performed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, finance, legal, operations
readiness impact if approved: No overlay readiness change expected.
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: approved | sufficiency: explicit_match | allowed approval roles: legal, operations
readiness impact if approved: No overlay readiness change expected.
Explicit operator/legal approval recorded; no automatic readiness mutation performed.
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | sufficiency: missing | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
2. Survey, Plats, and Site Plans
status: requested | sufficiency: missing | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
1. Title Commitment and Exception Documents
status: under_review | sufficiency: adjacent_only | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
2. Survey, Plats, and Site Plans
status: requested | sufficiency: missing | allowed approval roles: title, legal, engineering, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | sufficiency: missing | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
2. Survey, Plats, and Site Plans
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review evidence and approve only as title/legal if sufficient.
1. Title Commitment and Exception Documents
status: under_review | sufficiency: inferred_related | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
1. Title Commitment and Exception Documents
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: title, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review evidence and approve only as title/legal if sufficient.
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
2. Survey, Plats, and Site Plans
status: requested | sufficiency: missing | allowed approval roles: title, legal, engineering, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: adjacent_only | allowed approval roles: engineering, legal
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
5. Access, TXDOT, Right-of-Way, and Easements
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
5. Access, TXDOT, Right-of-Way, and Easements
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: missing | allowed approval roles: engineering, legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: requested | sufficiency: missing | allowed approval roles: engineering, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: requested | sufficiency: missing | allowed approval roles: engineering, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, legal
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: missing | allowed approval roles: engineering, operations
readiness impact if approved: No overlay readiness change expected.
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: requested | sufficiency: missing | allowed approval roles: engineering, operations
readiness impact if approved: No overlay readiness change expected.
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, operations
readiness impact if approved: No overlay readiness change expected.
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, finance, legal, operations
readiness impact if approved: No overlay readiness change expected.
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: environmental, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Review evidence and approve only as environmental/legal if sufficient.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: adjacent_only | allowed approval roles: finance, legal, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
2. Survey, Plats, and Site Plans
status: requested | sufficiency: missing | allowed approval roles: title, legal, engineering, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Review evidence and approve only as legal/finance/operations if sufficient.
5. Access, TXDOT, Right-of-Way, and Easements
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | sufficiency: missing | allowed approval roles: legal, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: requested | sufficiency: missing | allowed approval roles: engineering, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: requested | sufficiency: missing | allowed approval roles: engineering, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
7. Leases, Operating Contracts, and Property Agreements
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
7. Leases, Operating Contracts, and Property Agreements
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
7. Leases, Operating Contracts, and Property Agreements
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: closing 0% -> 3%; IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
7. Leases, Operating Contracts, and Property Agreements
status: under_review | sufficiency: inferred_related | allowed approval roles: legal, operations
readiness impact if approved: IC 2% -> 5%
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: requested | sufficiency: missing | allowed approval roles: engineering, operations
readiness impact if approved: No overlay readiness change expected.
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: requested | sufficiency: missing | allowed approval roles: engineering, operations
readiness impact if approved: No overlay readiness change expected.
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: approved | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: No overlay readiness change expected.
Explicit operator/legal approval recorded; no automatic readiness mutation performed.
No explicit supporting docs mapped.
3. Geotechnical and Engineering
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, operations
readiness impact if approved: No overlay readiness change expected.
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, finance, legal, operations
readiness impact if approved: No overlay readiness change expected.
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
4. Environmental, Zoning, Permits, and Governmental Approvals
status: approved | sufficiency: explicit_match | allowed approval roles: legal, operations
readiness impact if approved: No overlay readiness change expected.
Explicit operator/legal approval recorded; no automatic readiness mutation performed.
10. Entity, Authority, Litigation, and Closing Deliverables
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: requested | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: adjacent_only | allowed approval roles: finance, legal, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; closing 0% -> 3%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | sufficiency: missing | allowed approval roles: finance, legal
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Await seller response; add a note if reviewer follow-up is needed.
No explicit supporting docs mapped.
9. Insurance, Claims, and Loss History
status: sufficient_pending_approval | sufficiency: explicit_match | allowed approval roles: legal, finance, operations
readiness impact if approved: lender 3% -> 7%; IC 2% -> 5%
Review evidence and approve only as legal/finance/operations if sufficient.
9. Insurance, Claims, and Loss History
status: approved | sufficiency: missing | allowed approval roles: legal, finance, operations
readiness impact if approved: No overlay readiness change expected.
Explicit operator/legal approval recorded; no automatic readiness mutation performed.
No explicit supporting docs mapped.
6. Utilities, Service Availability, and Franchise Materials
status: under_review | sufficiency: inferred_related | allowed approval roles: engineering, finance, legal, operations
readiness impact if approved: No overlay readiness change expected.
Review seller response and either approve or reject with role-specific basis.
No explicit supporting docs mapped.
No obligations assigned to this lane.
Controlled action panel
Operator approval is separate from Data Room readiness. This panel only appends review events and never sends email.
Reviewer lane: title, legal | awaiting review by: title, legal | approval roles: title, legal
No review events recorded for this obligation.
Attach seller response document metadata and map it to requested obligations. This does not approve obligations or update Data Room readiness.
First checkbox maps documents/response. Second checkbox marks seller says not applicable and routes to review, not approval.
received 2026-05-12T19:05:00.000Z by Production Smoke Operator; docs 0; mapped 1; N/A 0
Production smoke note-only seller response intake test. No legal approval or readiness mutation intended.
No items in this bucket.
reviewer lane: title, legal, engineering, operations | awaiting review by: title, legal, engineering, operations
2. Survey, Plats, and Site Plans
status: requested | reviewer: engineering | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: title, legal | awaiting review by: title, legal
2. Survey, Plats, and Site Plans
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, legal | awaiting review by: engineering, legal
3. Geotechnical and Engineering
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, legal | awaiting review by: engineering, legal
3. Geotechnical and Engineering
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, legal | awaiting review by: engineering, legal
3. Geotechnical and Engineering
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, legal | awaiting review by: engineering, legal
3. Geotechnical and Engineering
status: requested | reviewer: legal | sufficiency: adjacent_only
Track seller response and review when received.
events: 0
reviewer lane: engineering, operations | awaiting review by: engineering, operations
3. Geotechnical and Engineering
status: requested | reviewer: engineering | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: environmental, legal | awaiting review by: environmental, legal
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: environmental, legal | awaiting review by: environmental, legal
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: environmental, legal | awaiting review by: environmental, legal
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: environmental, legal | awaiting review by: environmental, legal
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: legal, operations | awaiting review by: legal, operations
4. Environmental, Zoning, Permits, and Governmental Approvals
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, legal | awaiting review by: engineering, legal
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, legal | awaiting review by: engineering, legal
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: title, legal | awaiting review by: title, legal
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: title, legal | awaiting review by: title, legal
5. Access, TXDOT, Right-of-Way, and Easements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, operations | awaiting review by: engineering, operations
6. Utilities, Service Availability, and Franchise Materials
status: requested | reviewer: engineering | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, operations | awaiting review by: engineering, operations
6. Utilities, Service Availability, and Franchise Materials
status: requested | reviewer: engineering | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: engineering, operations | awaiting review by: engineering, operations
6. Utilities, Service Availability, and Franchise Materials
status: requested | reviewer: engineering | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: finance, legal | awaiting review by: finance, legal
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: finance, legal | awaiting review by: finance, legal
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: finance, legal | awaiting review by: finance, legal
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: finance, legal | awaiting review by: finance, legal
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: finance, legal, operations | awaiting review by: finance, legal, operations
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | reviewer: operations | sufficiency: adjacent_only
Track seller response and review when received.
events: 0
reviewer lane: finance, legal | awaiting review by: finance, legal
8. Taxes, Assessments, Financial, and Operating Statements
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: legal, finance, operations | awaiting review by: legal, finance, operations
9. Insurance, Claims, and Loss History
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: legal, finance, operations | awaiting review by: legal, finance, operations
9. Insurance, Claims, and Loss History
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: legal, finance, operations | awaiting review by: legal, finance, operations
9. Insurance, Claims, and Loss History
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: legal | awaiting review by: legal
10. Entity, Authority, Litigation, and Closing Deliverables
status: requested | reviewer: legal | sufficiency: adjacent_only
Track seller response and review when received.
events: 0
reviewer lane: legal | awaiting review by: legal
10. Entity, Authority, Litigation, and Closing Deliverables
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: finance, legal | awaiting review by: finance, legal
10. Entity, Authority, Litigation, and Closing Deliverables
status: requested | reviewer: legal | sufficiency: missing
Track seller response and review when received.
events: 0
reviewer lane: title, legal | awaiting review by: title, legal
1. Title Commitment and Exception Documents
status: under_review | reviewer: operator | sufficiency: adjacent_only
Review seller response/evidence with operator; legal sufficiency remains pending.
events: 1
reviewer lane: title, legal | awaiting review by: title, legal
1. Title Commitment and Exception Documents
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: engineering, legal | awaiting review by: engineering, legal
3. Geotechnical and Engineering
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: engineering, operations | awaiting review by: engineering, operations
3. Geotechnical and Engineering
status: under_review | reviewer: engineering | sufficiency: inferred_related
Review seller response/evidence with engineering; legal sufficiency remains pending.
events: 0
reviewer lane: legal, operations | awaiting review by: legal, operations
4. Environmental, Zoning, Permits, and Governmental Approvals
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: engineering, legal | awaiting review by: engineering, legal
5. Access, TXDOT, Right-of-Way, and Easements
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: engineering, operations | awaiting review by: engineering, operations
5. Access, TXDOT, Right-of-Way, and Easements
status: under_review | reviewer: operator | sufficiency: inferred_related
Review seller response/evidence with operator; legal sufficiency remains pending.
events: 1
reviewer lane: engineering, finance, legal, operations | awaiting review by: engineering, finance, legal, operations
6. Utilities, Service Availability, and Franchise Materials
status: under_review | reviewer: operations | sufficiency: inferred_related
Review seller response/evidence with operations; legal sufficiency remains pending.
events: 0
reviewer lane: engineering, legal, operations | awaiting review by: engineering, legal, operations
6. Utilities, Service Availability, and Franchise Materials
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: legal, operations | awaiting review by: legal, operations
7. Leases, Operating Contracts, and Property Agreements
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: legal, operations | awaiting review by: legal, operations
7. Leases, Operating Contracts, and Property Agreements
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: legal, operations | awaiting review by: legal, operations
7. Leases, Operating Contracts, and Property Agreements
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: legal, operations | awaiting review by: legal, operations
7. Leases, Operating Contracts, and Property Agreements
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
reviewer lane: legal | awaiting review by: legal
10. Entity, Authority, Litigation, and Closing Deliverables
status: under_review | reviewer: legal | sufficiency: inferred_related
Review seller response/evidence with legal; legal sufficiency remains pending.
events: 0
No items in this bucket.